Friday, December 30, 2011
Alistair's Current Closet
Opening Up the Floor
This week, Colin started wiring for the new bathroom as well as rewiring what was the kitchen and the living room. Chris also ripped up the old floor so that the plumber (Shawn) can run the pipes. In the photo below, the joists under the plywood run perpendicular to the wall. There appears to have been a staircase at some point (fifty years ago or more). Very curious as to what the layout of this house has been over time.
No sign of any bats in the attic today.
Labels:
bat,
bathroom,
demolition,
master bedroom,
plumbing,
wiring
Friday, December 23, 2011
New Master Suite Windows
The windows are in, and we can't get over how much light there is upstairs. We know that the light will be different once the walls are up, but in the meantime we are enjoying the light.
The bathroom window is nearly the width of the bathroom, which is kind of crazy. Again, not what we were envisioning at the beginning of our design process, but the large window will create a bright room.
Here is a view of the future master bedroom of the bathroom, hall, and closet.
Tuesday, December 20, 2011
New Window Preparations
Yesterday, they prepped the walls for the new windows (you can see the headers). We have the bathroom window already (since we ordered it for Charlotte's room before we realized that we it wasn't an egress window) and the bedroom window is due tomorrow.
Saturday, December 17, 2011
Bathroom Framing
It was too dark to take a picture on Friday afternoon of the bathroom framing that Chris, Brian and Dennis built, so here here a picture in the daytime. We can't believe how much they have done in less than two days of work.
Friday, December 16, 2011
Bathroom To Be - Demolition
This morning the guys cut away the floor where the bathroom is going to be. It looks like the floorboards were replaced, maybe for stairs. We often wonder what configurations and additions this house has been through in the past 150 years.
End of First Day Demo Upstairs
By the end of the day yesterday Chris, Brian, and Dennis had taken down the laundry room wall and the wall between the living room and kitchen. You can see the stack from the downstairs bathroom that used to run in the wall separating the two rooms. With the wall gone, the space seems huge, like we should have a dance party or something.
Thursday, December 15, 2011
Demo Phase Two - Upstairs
Today is the first day of work on the upstairs master suite. Alistair was happy to see Chris, Brian, and Dennis again. It didn't take them long to knock down the flimsy laundry room wall. Already the space seems so different.
Brian found evidence of munching carpenter ants on the little kitchen window header, which was what we expected. We had heard munching and even witnessed a mass exodus of flying male ants.
Monday, December 12, 2011
Porch Progress
Standing Seam Roof
Today a team of friendly, bearded men, many dressed in camouflage, installed the standing seam roof on our porch. They were quick, finishing the job before lunch. It looks great. Work on the porch is done now until spring.
Tuesday, December 6, 2011
New Stairs
Chris, Dennis, and Brian are pretty much finished will all the outside work until spring. Chris put the finishing touches on the new stairs this morning. The new metal roof should be installed soon. Chris put our old stairs off the back of the porch so we can use it this winter. We still need to figure out what we are doing for a patio off the back. We'll tackle landscaping in the spring.
Thursday, December 1, 2011
Railings