We're all set for the snow. The plywood roof is on and covered in waterproof paper.
Earlier in the week, Justin, Keefe and Rory worked in the morning when it was too cold to be out side. They put new blocking on top of the foundation to sister to the sill, which was showing signs of some rot. The 'firewood posts' have been replaced with pressurized posts secured on concrete. The new posts with new footings and a new laminated beam (adjacent to the basement stairs) are now in the rear section of the basement.
No comments:
Post a Comment