Friday, March 1, 2019

Inspection and Drywall

Colin spent many hours last night getting ready for this morning's electrical inspection.  He was able to run most of the electrical wires but not all of them.  We still have the supply cable to the upstairs panel, which is an issue.  We will either reroute to the upstairs panel it or get rid of it completely, and replace it with a second panel in the basement, running new wires upstairs for all the circuits.  We had a plumbing and electrical inspection this morning, and then the guys were waiting for the drywall to be delivered (which was late because they were short a driver).  We passed everything just fine.  We need to put a little access panel for the tub mechanics, but that's the only issue.


The drywall finally came along with half a dozen buckets of joint compound.  Justin and Keefe started in the dining room, and it seemed to take them only minutes to finish the ceiling.  Although hanging drywall always seems to shrink the room a bit, the room is so much brighter.



Evelyn loved watching the drywayll being hung in her room.  



No comments:

Post a Comment