Wednesday, February 29, 2012

Mud, Sand, Repeat

During Charlotte's naps, Alyssa has been working on the new drywall at the top of the stairs.  The main thing left to do is work on smoothing out t he wall where the old wall with the door was.  Tonight, Colin chipped away at the left of the two ridges.

The other area of work is the old doorway at the other end of the hall.  There are some big holes on the hallway side that need filling (that you can't really see in the picture).

No comments:

Post a Comment